Tuesday, March 16

Interior Renovation - Day 1 [Renovation Work Officially Begins Today]

  • Another set of materials were ordered today by Mang Rey. Most of the materials were for electrical works.
  • Mang Alexandro and Jeff completed stripping the T&B with its tiles. They just left untouched a small patch of tiles behind the pipe since the piping around the T&B will be concealed.
  • The wall-hung home entertainment system cabinet which I designed was assembled today by Mang Rey and Mang Eric. I closely worked with them to ensure that the measurements were precisely followed. I was amazed to learn that the cabinet can hold more than 60 kilos of load. Mang Rey himself sat on it and before I could protest he explained that the mounting was strong.
Notice the waist-level plank mounted on the wall - it will be used as guide for the double wall
This T&B will soon be ready for expansion
This cabinet can hold more than 60 kilos of load