Thursday, March 18

Interior Renovation - Day 3 [22 Sacks of Debris]

  • In the third day of the renovation work, 22 sacks of debris have been collected following the demolition of a small section of the T&B wall. I was informed that the pre-casted T&B walls were of high quality. It will be long before the T&B area will be worked on because the inner rooms - bedroom, reading nook and living room - will be prioritized in the succeeding days.
  • Additional double wall panels were added today in the dining and living room areas.
The neatly arranged vertical wall panels are intended to give more virtual vertical space
How do I get rid of all these debris?